Kuali Rice Development
  1. Kuali Rice Development
  2. KULRICE-2113

Failure to start SuiteLifecycles should result in failure for all tests in the Suite

    Details

    • Type: Improvement Improvement
    • Status: Closed Closed
    • Priority: Critical Critical
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 0.9.3
    • Component/s: Development, Unit Testing
    • Labels:
      None
    • Similar issues:
      KULRICE-14068IT Failure UifServletRequestDataBinderIntegrationTest tests
      KULRICE-11650IT Failure JpaMetadataProviderTest All entries should be the CompositeMetadataProviderImpl
      KULRICE-12947IT Failure 4 failures with Could not start Quartz Scheduler
      KULRICE-1756When Suite Lifecycle startup fails, already started lifecycles are not stopped
      KULRICE-13973IT Failure PeopleFlowRoutingTest
      KULRICE-11809IT Failure RollbackExceptionErrorReportingTest save method should have failed
      KULRICE-3747Unit Test Failures in 1.0.1.1
      KULRICE-8352Smoke Test Suites
      KULRICE-10920IT Failure ReferenceLinkerTest
      KULRICE-10957Labs Lookup Default and Labs Lookup Results Limit failures due to capitalization (uppercase)
    • Rice Module:
      Rice Core
    • Application Requirement:
      Rice

      Description

      If suite failure startup fails that means the entire suite is going to have trouble. We need to add code to RiceTestCase to track suite failure and fail subsequent tests.

        Activity

        Hide
        Eric Westfall added a comment -

        RiceTestCase now tracks suite failure and fails subsequent tests with appropriate failure message.

        Show
        Eric Westfall added a comment - RiceTestCase now tracks suite failure and fails subsequent tests with appropriate failure message.

          People

          • Assignee:
            Eric Westfall
            Reporter:
            Eric Westfall
          • Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

            Dates

            • Created:
              Updated:
              Resolved:

              Time Tracking

              Estimated:
              Original Estimate - 30 minutes
              30m
              Remaining:
              Remaining Estimate - 30 minutes
              30m
              Logged:
              Time Spent - Not Specified
              Not Specified

                Structure Helper Panel